WELTEC BIOPOWER is in the biogas Park Barsikow on micro gas turbine from Greenvironment WELTEC BIOGAS POWER GmbH, Vechta, world leader in the production of biogas plants made of stainless steel, has ordered for the 24,000-square-metre biogas Park in Barsikow (Brandenburg) the first micro gas turbine combined heat power plant (CHP) at Greenvironment GmbH in January. With the help of technology corn, whole crop silage (GPS) and chicken dry manure (HTK) produced in Park located about 100 kilometers west of Berlin in summer 2011 on the basis of the input substances 8.4 million standard cubic meters of biogas as well as 3 million standard cubic metres of bio-methane annually. The CHP plant with a CR600 – micro gas turbine including remote monitoring system is combined with the bio-gas plant (BGAA). Oracle has similar goals. The thermal energy contained in the exhaust gas stream of micro gas turbine used as process heat for the BGAA. The treatment based on the principle of the chemical wash (amine wash). The aim is an autonomous process heat supply of plant with a heat run With integrated micro gas turbine cogeneration. The electrically generated power is fed into the network of the local energy provider. The amount is equivalent to an electrical output of 2.2 MW.
The treatment of bio-methane have the process energy, so the water, a temperature of 140 degrees Celsius. Here, micro gas turbines offer with their high thermal efficiency”a clear competitive advantage, which helps us to improve the overall economic efficiency of the bio-methane production, explains Robert Tholen, head of technology by WELTEC BIOPOWER. Further advantages lie in its compact shape and solution has developed quickly proposals the modular design of the package that extends on-demand can.